The TY series FRP electric energy metering boxes developed by Teyi Electric Co., Ltd. are made of SMC unsaturated polyester resin glass fiber reinforced plastics through compression molding. They have the characteristics of reliable insulation, high strength, good flame retardancy, corrosion resistance, aging resistance, novel shape, smooth and beautiful surface, etc. The service life is more than 40 years indoors and more than 30 years outdoors, which is incomparable to other metal plastic electric meter boxes. This product is widely used in residential construction and civil power transformation. It can be combined with multiple households at will, and can also be installed in a single household or across households. It is easy to construct and has concealed wiring. This product adopts a strict rainproof design and is suitable for outdoor installation to ensure the safe operation of the electric meter.
TY series electric energy metering box includes two parts: single-phase meter box and three-phase meter box. It is suitable for AC 50Hz or 60Hz, rated working voltage up to 220V, 380V, 690V, rated working current of 10A-250A power supply system, for single-phase electric energy and power energy measurement and control management.
The TY series meter boxes are made of SMC unsaturated polyester resin glass fiber reinforced plastics (FRP) through compression molding, offering high strength and reliable insulation.
They have a service life of more than 40 years for indoor installations and more than 30 years for outdoor installations.
The ambient temperature should range from -25℃ to +50℃ (with a 24-hour average not exceeding +35℃). The relative humidity should not exceed 80% at 40℃, though higher humidity is permitted at lower temperatures.
The box material is not resistant to strong alkalis, oxidizing acids, amines, ketones, and is soluble in chlorinated hydrocarbons and aromatic solvents. Avoid contact with these chemicals.
The security protection level of this product is IP44.
The fixing positions are located inward. You must open the box before installation by removing the two upper cover fixing screws located in the middle of the lower part of the meter box.